Llamanos

+86 189 0200 6688

Inicio > Productos > Tubo de acero galvanizado > Tubo de construcción

Galvanized BS1387 Steel Pipe For Construction

Compartimiento

Application:Structure Pipe

Technique:ERW

Certification:ISO

Surface Treatment:Galvanized

Special Pipe:Thick Wall Pipe

Alloy Or Not:Non-alloy

Product name:galvanized bs1387 steel pipe for construction

Keyword:galvanized bs1387 steel pipe

Secondary Or Not:Non-secondary


Descripción del producto


Galvanized BS1387 Steel Pipe 

 Product Name:

  galvanized bs1387 steel pipe for construction

  Size

  OD  (mm)

16mm-273mm

  Wall Thickness (mm)

 1.0mm-10.0mm

  ZINC COATED (g/m2)

 200-500

  Standard

 ASTM A53,AS1163,EN10219,BS1387 and so on

  Section shape

  Round

  Type

  ERW Pipe

  Length

  5.8M, 6M, 11.8M, 12M or customized length

Galvanized BS1387 Steel Pipe For Construction

Galvanized BS1387 Steel Pipe For Construction

Different galvanized steel pipe:

1.Pre-galvanized:
Pre galvanized steel pipe is made of hot dipped galvanized steel strip directly.
Zinc coating:40-60g/sm ,If need more zinc coating ,we can make processing as the order.(Thickness is 0.7mm-4.5mm )


2.Hot dipped galvanized:
Hot dipped galvanized pipe has thicker zinc coating than pre galvanized pipe. Black steel pipe will be dipped into zinc pool for galvanizing.Zinc coating could be:200-500g/sm


Product nameGalvanized BS1387 Steel Pipe
Technique

Longitudinal Electronic Resistance Welding (ERW)

High Frequence Welding (HFW)

Material QualitySteel Grade

Q195 Q215Q235Q345, etc.

Material TypeAvailable in cold rolled and hot rolled
SizeW.T.10.0mm-20.0mm
Diameter

40 inch

Length1m-12m or as your requirement
Surface

Galvanized, 3PE, painting, coating oil, steel stamp, etc.

Ends

Plain ends, cutting, threaded with coupling, beveled, flange, etc.

Inspection

With Chemical Composition and Mechanical Properties Testing; Hydrostatic Test, Dimensional and Visual Inspection, With Nondestructive Inspection

Certification

BV, ISO, IAF or as per customer.

Application

construction pipe, structure pipe, Greenhouse pipe, Building material tube, Furniture tube, etc

Trade Terms

FOB, CFR, CIF, EXW.

Payment Terms

T/T,L/C at sight

 

30%T/T in advance,balance 70% should be paid after receiving the copy of BL.

Loading Port

Tianjin Port

Cooperation

Ship-owner

MSK, CMA, MSC, HMM, COSCO, UA, NYK, OOCL, HPL, YML, MOL